6.14 Trolley and Grate Cleaning Device
General Item
6.14.1 Trolley sliding plate and sintering equipment body shall evenly contact.
Check quantity:to check all.
Inspection method:inspection.
6.14.2 Thermal expansion gap for grate installation shall meet requirements of design technical document.
Check quantity:spot check 20%.
Inspection method:to inspect,to take actual measurements.
6.14.3 Stroke of grate cleaning device shall meet requirements of design technical document.
Check quantity:to check all.
Inspection method:to check installation quality records.
6.14.4 Tolerance for installation of trolley cleaning device shall meet requirements in Table 6.14.4.
Check quantity:to check all.
Inspection method:see Table 6.14.4.
Table 6.14.4 Tolerance for installation of trolley cleaning device